Work Done 2/17/14 to 2/21/14

2/17/14 – Fabrication

>Fabrication of Left rear floor/pumpkin section- fabricated patch panel, temporarily secured with sheet metal screws on floor side, welded/ground on rear panel side.

2/18/14 – Fabrication

>Positioned rear tubing sections on rear panel, outside of pumpkin. Total of four. Made small filler sections to replace rotted sections. Cleaned up Fittings that were seized on threads.

2/19/14 to 2/20/14 – Fabrication

>Began metal finishing on the outer panel from behind Right Rear door to center of the rear. Majority of damage was located near the lower section including torn metal lips that were straightened and rewelded

2/21/14 – No work done.