Engine Install-
engine was installed and bolted wiring harness was fed to the rear for starter, generator and voltage regulator. Rear tail light wiring as well.
Floor Pans Install-
Center floor pans were measured and screwed in for perfect fitment before final weld. Center floor pans were finally welded in and undercoated.
Center Tunnel Construction-
Cable guides, Fuel lines, shift shaft and wiring harness were all pre-installed before final construction of the center tunnel. Pedal assembly was fitted in and bolted. Final construction of the tunnel and throttle cable guide where made, welded and undercoated.