Work Done 06/23/2014 to 07/01/2014

05/23/14 to 07/01/14 –

Assembly:

Installed transmission and trans axles, detailed all bolts and undercarriage parts (nuts, washers, etc.,), detailed and painted spring platesĀ and covers, rebuilt steering box and new tie rod ends (inner & outer), detailed backing plates and installed with new brake components, installed rear wheel bearing kit, seals were replaced with new wheel cylinder kits, rebuilt all four front brake cylinders, front suspension control arms greased and detailed. Rear brake lines cleaned and installed. Steering shaft and steering coupler refurbished and installed.

 

The Speedster as it sits today:

*We plan on having the chassis rolling this week. Gauges are expected back this week as well.