Work Done 04/11/14 to 04/18/14

04/11/14 to 04/14/14 – Fabrication

> Began metal finishing (nose panel).
> Removed left and right side pedal support & prepped for replacements.
> New panels trimmed to fit & temporarily secured w/ sheet metal screws.

04/14/14 – Fabrication

> Removed left firewall support panel bracket & prepped for replacement piece.
> Fabricated bracket for left firewall support panel. Temporarily secured.

04/15/14 – Fabrication

> Trimmed new inner storage compartment front panel.
> New panel also trimmed/sized for install.
> Spot welds pre-drilled & temporarily secured with sheet metal screws.

04/16/14 to 04/18/14 – Fabrication

> Lower section replacement panel trimmed and sized for install.
>Front inner storage compartment was welded in and ground flush.
> Lower section replacement panel fully welded and ground flush.