Work Done 09/22/14

Engine Install-

engine was installed and bolted wiring harness was fed to the rear for starter, generator and voltage regulator.  Rear tail light wiring as well.

 

 

Floor Pans Install-

Center floor pans were measured and screwed in for perfect fitment before final weld.  Center floor pans were finally welded in and undercoated.

 

Center Tunnel Construction-

Cable guides, Fuel lines, shift shaft and wiring harness were all pre-installed before final construction of the center tunnel.  Pedal assembly was fitted in and bolted.  Final construction of the tunnel and throttle cable guide where made, welded and undercoated.